Two week project including the design and installation of two hot water calorifiers and replace with new plate heat exchangers i.e. Cetemodule exchanger units able to cater for abnormal/intermittent peak demands.
Benefits: Upgrade of existing equipment to new more energy efficient units but able to accommodate peak demands.
Unit removed from site, refurbished within our workshops, re-installed and inverter drive re-commissioned.
Benefits: Energy Saving
This unit was specially designed to suit a roof top chiller unit in the centre London.
Benefits: Energy Saving
Outline of works carried out. Engineers attended site during Christmas shut down. Sewage pumping station foot stalls and associated pipe work were replaced.
Benefits: Increased the efficiency of the pumping station
Engineers carry out monthly service on all mechanical operations and take water samples to check water quality.